13 resuming

The right hand half of the caravan. A single door is near the middle of the shot, with our bedroom window to the right. The sky is overcast and a thick band of mustard is painted across the middle of an otherwise white caravan

Kia ora,

A lot has happened since I put the newsletter on hold. Of most relevance for the newsletter is that we have now all but finished the caravan (!)

I’ve been less directly involved in the last stages. I can’t return to the old format of the newsletter, but I want to share with you photos of the finished caravan and describe what we’ve ended up with.

Left hand side of the caravan. Double door in the middle with a table and charis visible. small window to the left near the edge of the caravan. you can see the toilet cassette hatch at the bottom right. sky is overcast, mustard strip very prominent against the white caravan

There will be three more editions of this newsletter, each roughly a week apart. I’ll include photos of the rooms, describe some of the decisions we’ve made, and give an update on how it’s coping with the winter weather.

The towing end of the caravan, showing two narrow windows and the millard logo.

The title of next week’s newsletter is Furnishing.

I’ve missed you all a lot.

Ngā mihi maioha, Giles.